[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-920331":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},920331,595,1,"单选题","设计桩基纵筋长度时，以下哪项措施中错误的是( )。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","嵌岩端承桩应通长配筋",false,{"key":16,"text":17,"correct":18},"B","抗拔桩的配筋长度应不少于桩长的1／2",true,{"key":20,"text":21,"correct":14},"C","8度及以上地震区的桩应通长配筋",{"key":23,"text":24,"correct":14},"D","受水平荷载和弯矩较大的桩，配筋长度应通过计算确定","参见《建筑地基基础设计规范》(GB50001.1)第8.5.3条第8款。",{"id":6,"name":27,"category":28,"favorite":7},"建筑结构与设备","建筑工程"]