[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-920109":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},920109,595,1,"单选题","以下有关在现浇钢筋混凝土结构中设置后浇带的叙述不正确的是( )o",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","在大面积筏形基础中，每隔20～40m留一道后浇带，可以减少混凝土硬化过程中的收缩应力",false,{"key":16,"text":17,"correct":14},"B","高层主楼与裙房之间，在施工阶段设置后浇带有适当调整两者之间的沉降差的作用",{"key":19,"text":20,"correct":14},"C","长宽很大的上部结构每隔30-40m设置施工后浇带，是为了减少混凝土硬化过程中的收缩应力",{"key":22,"text":23,"correct":24},"D","大面积基础的后浇带和上部结构的后浇带均可以在混凝土浇筑完成10天后将其填灌",true,"在高层建筑与裙房之间，为了建筑立面处理方便以及地下室防水要求，可以不设沉降缝而采用后浇带，但后浇带原则上应在高层部分主体结构完工，沉降基本稳定(即后浇带混凝土宜根据实测沉降值并计算后期沉降差能满足设计要求后方可进行浇注)后灌缝。同时后浇带可减少混凝土硬化过程中在结构中产生的收缩应力。",{"id":6,"name":27,"category":28,"favorite":7},"建筑结构与设备","建筑工程"]