[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-919795":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},919795,595,1,"单选题","关于建筑物桩基的沉降验算，以下说法不正确的是( )。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","嵌岩桩可不进行沉降验算",false,{"key":16,"text":17,"correct":14},"B","当有可靠经验时，对地质条件不复杂、荷载均匀、对沉降无特殊要求的端承桩桩基可不进行沉降验算",{"key":19,"text":20,"correct":21},"C","摩擦型桩基可不进行沉降验算",true,{"key":23,"text":24,"correct":14},"D","地基基础设计等级为甲级的建筑物桩基必须进行沉降验算","",{"id":6,"name":27,"category":28,"favorite":7},"建筑结构与设备","建筑工程"]