[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-919693":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},919693,595,1,"单选题","受力钢筋的接头宜优先采用焊接接头，无条件焊接时，也可采用绑扎接头，但( )不得采用绑扎接头。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","受弯构件及受扭构件",false,{"key":16,"text":17,"correct":14},"B","轴心受压构件及偏心受压构件",{"key":19,"text":20,"correct":14},"C","轴心受拉构件及偏心受拉构件",{"key":22,"text":23,"correct":24},"D","轴心受拉构件及小偏心受拉构件",true,"",{"id":6,"name":27,"category":28,"favorite":7},"建筑结构与设备","建筑工程"]