[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-919183":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},919183,592,2,"多选题","下列选项中，不属于公共性设施开发过程的是（ ）阶段。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","可行性研究",false,{"key":16,"text":17,"correct":18},"B","项目构想与策划",true,{"key":20,"text":21,"correct":18},"C","项目投融资?",{"key":23,"text":24,"correct":18},"D","销售与经营",{"key":26,"text":27,"correct":14},"E","项目决策","BCD","本题主要考核公共性设施开发的过程。公共设施的开发，通常可以分为以下几个阶段：项目设想阶段、可行性研究阶段、项目决策阶段、项目实施阶段、项目投入使用阶段。 主要掌握公共性设施开发与城市规划实施的关系。",{"id":6,"name":31,"category":32,"favorite":33},"城乡规划原理","建筑工程",0]