[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-918465":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},918465,591,2,"多选题","下列关于城市供电规划的表述，哪些是正确的（ ）",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","变电站应接近负荷中心",true,{"key":16,"text":17,"correct":18},"B","市区内新建变电站应采用户外式",false,{"key":20,"text":21,"correct":14},"C","变电站可以与其他建筑物混合建设",{"key":23,"text":24,"correct":18},"D","电信线路、有线电视线路与供电线路通常应合杆架设",{"key":26,"text":27,"correct":18},"E","人均综合用电量指标法常用于城市详细规划阶段的负荷预测","AC","P191-197，预测方法：（总规阶段）：电力弹性系数法、回归分析法、增长率法、人均用电指标法、横向比较法、负荷密度法、单耗法。 （详规阶段）：单位建筑面积负荷指标法；单耗法。 变电所结构型式：⑴边缘、郊区（全户外、半户外） ⑵市区内新建（户内、半户内） ⑶市中心新建（户内） ⑷高层、繁华（小型户内） ⑸可与其他建筑混合建设或建设地下变电所",{"id":6,"name":31,"category":32,"favorite":33},"城乡规划相关知识","建筑工程",0]