[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-918041":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},918041,591,1,"单选题","符合下列哪项条件时，应该设置立体交叉（ ）",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","城市主干路与次干路交叉口高峰小时流量超过5000PCU时",false,{"key":16,"text":17,"correct":14},"B","城市主干路与支路交叉口高峰小时流量超过5000PCU时",{"key":19,"text":20,"correct":21},"C","城市主干路与主干路交叉口高峰小时流量超过6000PCU时",true,{"key":23,"text":24,"correct":14},"D","城市次干路与铁路专用线相交时","设置立体交叉的条件：①快速道路（速度≥80km\u002Fh的城市快速路、高速公路）与其他道路相交； ②主干路交叉口高峰小时流量超过6000辆当量小汽车（pcu）时； ③城市干路与铁路干线交叉； ④特殊要求交叉口与桥头； ⑤具有用地和高差条件。",{"id":6,"name":27,"category":28,"favorite":29},"城乡规划相关知识","建筑工程",0]