[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-917480":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},917480,591,1,"单选题","下列选项中，不属于城市供电工程规划总体规划中的主要内容的是( )。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","预测城市供电负荷",false,{"key":16,"text":17,"correct":14},"B","选择城市供电电源",{"key":19,"text":20,"correct":21},"C","计算用电负荷",true,{"key":23,"text":24,"correct":14},"D","确定城市变电站容量和数量","",{"id":6,"name":27,"category":28,"favorite":29},"城乡规划相关知识","建筑工程",0]