[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-917418":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},917418,591,1,"单选题","铁路和城市干道的立交控制标高要在( )阶段确定。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","总体规划",true,{"key":16,"text":17,"correct":18},"B","详细规划",false,{"key":20,"text":21,"correct":18},"C","修建性详细规划",{"key":23,"text":24,"correct":18},"D","城市设计","铁路和城市干道的立交控制标高要在总体规划阶段确定。铁路坡度及标高一般不易改变。城市干道能否在保证净空限制高度的情况下通过，必要时也要放大比例尺研究确定。在地形条件限制很严的情况下，有时为了合理的解决标高甚至要局部调整干道系统。",{"id":6,"name":27,"category":28,"favorite":29},"城乡规划相关知识","建筑工程",0]