[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-917395":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},917395,591,1,"单选题","下列选项中，属于城市用地竖向工程规划控制性详细规划阶段的内容与深度的是( )。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","补充与调整其他用地控制标高",true,{"key":16,"text":17,"correct":18},"B","落实防洪、排涝工程设施的位置、规模及控制标高",false,{"key":20,"text":21,"correct":18},"C","确定城市主干道与公路、铁路交叉口点的控制标高",{"key":23,"text":24,"correct":18},"D","补充总体规划的用地竖向规划中缺少的其他控制标高","",{"id":6,"name":27,"category":28,"favorite":29},"城乡规划相关知识","建筑工程",0]