[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-916851":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},916851,590,1,"单选题","在《城市排水工程规划规范》中规定，城市雨水规划重现区，应根据城市性质、重要性以及汇水类型等因素确定。其中重要干道、重要地区或短期积水能引起严重后果的地区，重现期宜为( )。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","1～3年",false,{"key":16,"text":17,"correct":14},"B","2～4年",{"key":19,"text":20,"correct":21},"C","3～5年",true,{"key":23,"text":24,"correct":14},"D","4～6年","",{"id":6,"name":27,"category":28,"favorite":29},"城乡规划管理与法规","建筑工程",0]