[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-916741":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},916741,590,1,"单选题","对《城市总体规划审查工作规则》中的规划审查程序正确的是( )。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","前期工作→征求有关部门的意见→上报要求→协调意见→报批",false,{"key":16,"text":17,"correct":18},"B","前期工作→上报要求→征求有关部门的意见→协调意见→报批",true,{"key":20,"text":21,"correct":14},"C","上报要求→前期工作→征求有关部门的意见→报批→协调意见",{"key":23,"text":24,"correct":14},"D","上报要求→前期工作→征求有关部门的意见→协调意见→报批","",{"id":6,"name":27,"category":28,"favorite":29},"城乡规划管理与法规","建筑工程",0]