[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-916598":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},916598,590,1,"单选题","下列行政行为中，不属于建设工程规划管理审核内容的是（ ）。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","审核建设工程申请条件",false,{"key":16,"text":17,"correct":14},"B","审查使用土地的有关证明文件和建设工程设计方案总平面图",{"key":19,"text":20,"correct":14},"C","审核修建性详细规划",{"key":22,"text":23,"correct":24},"D","审核建设工程设计人员资格",true,"设计图纸以及有关文件，经审查批准后，核发建设工程规划许可证。",{"id":6,"name":27,"category":28,"favorite":29},"城乡规划管理与法规","建筑工程",0]