[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-916309":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},916309,590,1,"单选题","在城市抗震防灾规划所确定的危险地段不得进行新的开发建设，已建的应当（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","立即停止使用并拆除",false,{"key":16,"text":17,"correct":18},"B","限期拆除或停止使用",true,{"key":20,"text":21,"correct":14},"C","立即停止使用",{"key":23,"text":24,"correct":14},"D","立即拆除","在城市抗震防灾规划所确定的危险地段不得进行新的开发建设，已建的应当限期拆除或者停止使用。",{"id":6,"name":27,"category":28,"favorite":29},"城乡规划管理与法规","建筑工程",0]