[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-916264":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},916264,590,1,"单选题","根据城乡规划管理需要，城市中心区、旧城改造区、拟进行土地储备或者土地出让的地区，应当优先组织编制（ ）。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","战略规划",false,{"key":16,"text":17,"correct":14},"B","分区规划",{"key":19,"text":20,"correct":21},"C","控制性详细规划",true,{"key":23,"text":24,"correct":14},"D","修建性详细规划","编制控制性详细规划，应当依据经批准的城市、镇总体规划，遵守国家有关标准和技术规范，采用符合国家有关规定的基础资料。",{"id":6,"name":27,"category":28,"favorite":29},"城乡规划管理与法规","建筑工程",0]