[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-916261":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},916261,590,1,"单选题","在详细规划阶段不需要划定的控制线是（ ）。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","城市绿线",false,{"key":16,"text":17,"correct":14},"B","城市黄线",{"key":19,"text":20,"correct":21},"C","城市紫线",true,{"key":23,"text":24,"correct":14},"D","城市蓝线","《城市紫线管理办法》第三条，国家历史文化名城的城市紫线由城市人民政府在组织编制历史文化名城保护规划时划定。其他城市的城市紫线由城市人民政府在组织编制城市总体规划时划定。",{"id":6,"name":27,"category":28,"favorite":29},"城乡规划管理与法规","建筑工程",0]