[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-916114":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},916114,590,2,"多选题","根据行政法律关系知识和城乡规划实施的实践，下列对应关系中不正确的是（ ）。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","建设项目报建申请并受理——行政法律关系产生",false,{"key":16,"text":17,"correct":18},"B","城乡规划主管部门审定报建总图——行政法律关系产生",true,{"key":20,"text":21,"correct":18},"C","在建项目在地震中灭失——行政法律关系变更",{"key":23,"text":24,"correct":14},"D","建设单位报送竣工资料后——行政法律关系消灭",{"key":26,"text":27,"correct":18},"E","已报建项目依法转让——行政法律关系消灭","BCE","B选项，权利和义务使用完毕而消灭；C选项，客体消灭导致行政法律关系的消灭；E选项，一方当事人发生了变化而变更。",{"id":6,"name":31,"category":32,"favorite":33},"城乡规划管理与法规","建筑工程",0]