[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-589-13":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":597},{"id":5,"name":6,"category":7,"favorite":8},589,"测绘综合能力","建筑工程",0,13,50,2959,[13,34,46,58,70,82,94,106,118,130,142,154,166,178,186,198,210,222,234,246,258,270,282,294,305,317,329,339,348,360,372,384,396,406,418,430,442,454,462,470,482,494,506,514,526,538,550,561,573,585],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":24,"analysis":33},913640,1,"单选题","陀螺经纬仪在地理南北纬度不大于()的范围内，一般不受时间和环境等条件限制，可实现快速定向。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","80°",false,{"key":24,"text":25,"correct":26},"B","75°",true,{"key":28,"text":29,"correct":22},"C","60°",{"key":31,"text":32,"correct":22},"D","50°","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":28,"analysis":33},913641,"根据《工程测量规范》(GB50026—2007)中卫星定位测量的主要技术要求，四等的平均边长为2km，其约束平差后最弱边相对中误差的要求为()。",[38,40,42,44],{"key":20,"text":39,"correct":22},"≤1\u002F120000",{"key":24,"text":41,"correct":22},"≤1\u002F70000",{"key":28,"text":43,"correct":26},"≤1\u002F40000",{"key":31,"text":45,"correct":22},"≤1\u002F20000",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":28,"analysis":33},913642,"使用全站仪极坐标放样时，需要向全站仪输入测站数据，下列不属于测站数据的是()。",[50,52,54,56],{"key":20,"text":51,"correct":22},"测站坐标",{"key":24,"text":53,"correct":22},"仪器高",{"key":28,"text":55,"correct":26},"测点坐标",{"key":31,"text":57,"correct":22},"目标高",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":28,"analysis":33},913643,"在平面内连接不同线路方向的曲线，称为()。",[62,64,66,68],{"key":20,"text":63,"correct":22},"圆曲线",{"key":24,"text":65,"correct":22},"缓和曲线",{"key":28,"text":67,"correct":26},"平曲线",{"key":31,"text":69,"correct":22},"竖曲线",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":28,"analysis":33},913644,"圆曲线的起点的代号通常用()表示。",[74,76,78,80],{"key":20,"text":75,"correct":22},"YZ",{"key":24,"text":77,"correct":22},"QZ",{"key":28,"text":79,"correct":26},"ZY",{"key":31,"text":81,"correct":22},"JD",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":31,"analysis":33},913645,"测量误差影响的是测量数据，放样误差影响的则是()。",[86,88,90,92],{"key":20,"text":87,"correct":22},"距离数据",{"key":24,"text":89,"correct":22},"点的平面坐标数据",{"key":28,"text":91,"correct":22},"点的高程数据",{"key":31,"text":93,"correct":26},"实地点位",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":28,"analysis":33},913646,"针对工程项目，变形监测的网点可分三种，不包括()。",[98,100,102,104],{"key":20,"text":99,"correct":22},"基准点",{"key":24,"text":101,"correct":22},"工作基点",{"key":28,"text":103,"correct":26},"大地原点",{"key":31,"text":105,"correct":22},"变形观测点",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":31,"analysis":33},913647,"测定建筑物的平面位置随时间而移动的工作叫()。",[110,112,114,116],{"key":20,"text":111,"correct":22},"挠度观测",{"key":24,"text":113,"correct":22},"裂缝观测",{"key":28,"text":115,"correct":22},"沉降观测",{"key":31,"text":117,"correct":26},"水平位移观测",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":24,"analysis":33},913648,"已知道路交点桩号为K5+316.24，圆曲线切线长为62.50m，则圆曲线起点的桩号为()。",[122,124,126,128],{"key":20,"text":123,"correct":22},"K5+191.24",{"key":24,"text":125,"correct":26},"K5+253.74",{"key":28,"text":127,"correct":22},"K5+378.74",{"key":31,"text":129,"correct":22},"K5+441.24",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":20,"analysis":33},913649,"地下管线隐蔽管线点的探查精度要求：其平面位置限差为()。（注：h为管线中心的埋深，小于1m时按1m计。）",[134,136,138,140],{"key":20,"text":135,"correct":26},"0.1h",{"key":24,"text":137,"correct":22},"0.15h",{"key":28,"text":139,"correct":22},"0.2h",{"key":31,"text":141,"correct":22},"0.3h",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":28,"analysis":33},913650,"地下管线点的测量精度为：相对于邻近控制点，点位平面位置中误差不超过()。",[146,148,150,152],{"key":20,"text":147,"correct":22},"±3cm",{"key":24,"text":149,"correct":22},"±4cm",{"key":28,"text":151,"correct":26},"±5cm",{"key":31,"text":153,"correct":22},"±6cm",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":20,"analysis":33},913651,"关于建筑竣工测量，以下描述不正确的是()。",[158,160,162,164],{"key":20,"text":159,"correct":26},"建筑竣工测量是在建筑工程施工阶段进行的",{"key":24,"text":161,"correct":22},"建筑竣工测量的目的是为工程的交工验收及将来的维修、改建、扩建提供依据",{"key":28,"text":163,"correct":22},"建筑竣工测量主要包括建筑平面位置及四至关系测量、建筑高程及高度测量",{"key":31,"text":165,"correct":22},"竣工测量时，建筑物高度测量可以采用手持测距仪测量",{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":28,"analysis":33},913652,"下列测量方法中，不可用于测定工程建筑物垂直位移的有()。",[170,172,174,176],{"key":20,"text":171,"correct":22},"三角高程测量",{"key":24,"text":173,"correct":22},"水准测量",{"key":28,"text":175,"correct":26},"导线测量",{"key":31,"text":177,"correct":22},"液体静力水准测量",{"id":179,"libraryId":5,"type":15,"typeLabel":16,"stem":180,"options":181,"answer":24,"analysis":33},913653,"地下管线隐蔽管线点的探查精度要求：其埋深限差为()。（注：h为管线中心的埋深，小于1m时按1m计。）",[182,183,184,185],{"key":20,"text":135,"correct":22},{"key":24,"text":137,"correct":26},{"key":28,"text":139,"correct":22},{"key":31,"text":141,"correct":22},{"id":187,"libraryId":5,"type":15,"typeLabel":16,"stem":188,"options":189,"answer":24,"analysis":33},913654,"根据《工程测量规范》(GB50026—2007)，卫星定位测量控制网的布设应符合下列要求：控制网应由独立观测边构成一个或若干个闭合环或附合路线，各等级控制网中构成闭合环或附合路线的边数不宜多于()条。",[190,192,194,196],{"key":20,"text":191,"correct":22},"5",{"key":24,"text":193,"correct":26},"6",{"key":28,"text":195,"correct":22},"7",{"key":31,"text":197,"correct":22},"8",{"id":199,"libraryId":5,"type":15,"typeLabel":16,"stem":200,"options":201,"answer":31,"analysis":33},913655,"导线角度闭合差的调整方法是将闭合差反符号后()。",[202,204,206,208],{"key":20,"text":203,"correct":22},"按角度大小成正比例分配",{"key":24,"text":205,"correct":22},"按角度大小成反比例分配",{"key":28,"text":207,"correct":22},"按边长成正比例分配",{"key":31,"text":209,"correct":26},"按角的个数平均分配",{"id":211,"libraryId":5,"type":15,"typeLabel":16,"stem":212,"options":213,"answer":28,"analysis":33},913656,"根据《工程测量规范》(GB50026—2007)，高程控制测量一般规定，高程控制点间的距离，一般地区应为1～3km，工业厂区、城镇建筑区宜小于lkm。但一个测区及周围至少应有()个高程控制点。",[214,216,218,220],{"key":20,"text":215,"correct":22},"1",{"key":24,"text":217,"correct":22},"2",{"key":28,"text":219,"correct":26},"3",{"key":31,"text":221,"correct":22},"4",{"id":223,"libraryId":5,"type":15,"typeLabel":16,"stem":224,"options":225,"answer":28,"analysis":33},913657,"工程地形图上，地物点相对于邻近图根点的点位中误差，水域地区不应超过图上()。",[226,228,230,232],{"key":20,"text":227,"correct":22},"±0.6mm",{"key":24,"text":229,"correct":22},"±0.8mm",{"key":28,"text":231,"correct":26},"±1.5mm",{"key":31,"text":233,"correct":22},"±2.0mm",{"id":235,"libraryId":5,"type":15,"typeLabel":16,"stem":236,"options":237,"answer":31,"analysis":33},913658,"对于地下管线数据建库，以下描述不正确的是()。",[238,240,242,244],{"key":20,"text":239,"correct":22},"地下管线数据库是某一区域地下管线数据的集合",{"key":24,"text":241,"correct":22},"地下管线数据库一般包括地下管线数据和必要的地形数据",{"key":28,"text":243,"correct":22},"地下管线数据包括地下管线要素的空间数据和属性数据",{"key":31,"text":245,"correct":26},"地下管线属性一般包括材质、规格、建设时间等，但不包括权属单位",{"id":247,"libraryId":5,"type":15,"typeLabel":16,"stem":248,"options":249,"answer":24,"analysis":33},913659,"规划中线不能通视时，可在规划红线内能通视的地方用()实定轴线，略图上注明轴线与中线的间距，也可直接定出红线。",[250,252,254,256],{"key":20,"text":251,"correct":22},"平行法",{"key":24,"text":253,"correct":26},"平行移轴法",{"key":28,"text":255,"correct":22},"目估法",{"key":31,"text":257,"correct":22},"直角转弯法",{"id":259,"libraryId":5,"type":15,"typeLabel":16,"stem":260,"options":261,"answer":28,"analysis":33},913660,"依据《工程测量规范》(GB50026—2007)“纸质地形图的绘制”有关规定，对于“不依比例尺绘制的符号”，应保持()。",[262,264,266,268],{"key":20,"text":263,"correct":22},"其轮廓位置的精度",{"key":24,"text":265,"correct":22},"其主线位置的几何精度",{"key":28,"text":267,"correct":26},"其主点位置的几何精度",{"key":31,"text":269,"correct":22},"其符号的整体美观性",{"id":271,"libraryId":5,"type":15,"typeLabel":16,"stem":272,"options":273,"answer":31,"analysis":33},913661,"下列关于线路施工与竣工测量说法不正确的是()。",[274,276,278,280],{"key":20,"text":275,"correct":22},"线路复测是在线路中线桩定测已在地面标定之后进行的",{"key":24,"text":277,"correct":22},"线路复测的目的是恢复定测桩点和监测定测质量",{"key":28,"text":279,"correct":22},"线路复测工作的内容和定测一致",{"key":31,"text":281,"correct":26},"线路复测的方法与定测的方法不能相同",{"id":283,"libraryId":5,"type":15,"typeLabel":16,"stem":284,"options":285,"answer":20,"analysis":33},913662,"根据《工程测量规范》(GB50026—2007)，对于公路测量，定测中线桩位测量应符合下列规定：线路中线桩的间距，直线部分不应大于50m，平曲线部分宜为20m。对于公路曲线半径小于30m、缓和曲线长度小于30m或回头曲线段，中线桩间距均不应大于()。",[286,288,290,292],{"key":20,"text":287,"correct":26},"5m",{"key":24,"text":289,"correct":22},"10m",{"key":28,"text":291,"correct":22},"20m",{"key":31,"text":293,"correct":22},"50m",{"id":295,"libraryId":5,"type":15,"typeLabel":16,"stem":296,"options":297,"answer":31,"analysis":33},913663,"按《工程测量规范》(GB50026—2007)，地形图的基本等高距应按地形类别和测图比例尺进行选择，对于1：5000的丘陵地形图应该选择()为基本等高距。",[298,300,302,304],{"key":20,"text":299,"correct":22},"0.5m",{"key":24,"text":301,"correct":22},"1m",{"key":28,"text":303,"correct":22},"2m",{"key":31,"text":287,"correct":26},{"id":306,"libraryId":5,"type":15,"typeLabel":16,"stem":307,"options":308,"answer":31,"analysis":33},913664,"图根点相对于基本控制点的点位中误差不应超过图上±0.1mm，高程中误差不应超过基本等高距的()。",[309,311,313,315],{"key":20,"text":310,"correct":22},"1\u002F2",{"key":24,"text":312,"correct":22},"1\u002F3",{"key":28,"text":314,"correct":22},"1\u002F5",{"key":31,"text":316,"correct":26},"1\u002F10",{"id":318,"libraryId":5,"type":15,"typeLabel":16,"stem":319,"options":320,"answer":31,"analysis":33},913665,"数百米至数千米的精密距离测量宜使用()。",[321,323,325,327],{"key":20,"text":322,"correct":22},"精密钢尺",{"key":24,"text":324,"correct":22},"精密经纬仪",{"key":28,"text":326,"correct":22},"精密水准仪",{"key":31,"text":328,"correct":26},"精密全站仪",{"id":330,"libraryId":5,"type":15,"typeLabel":16,"stem":331,"options":332,"answer":24,"analysis":33},913667,"对数字测图方法，对于1:1000比例尺测图，每平方千米图根点的数量不少于()。",[333,335,337,338],{"key":20,"text":334,"correct":22},"64",{"key":24,"text":336,"correct":26},"16",{"key":28,"text":197,"correct":22},{"key":31,"text":221,"correct":22},{"id":340,"libraryId":5,"type":15,"typeLabel":16,"stem":341,"options":342,"answer":20,"analysis":33},913668,"下列不属于平面曲线的是()。",[343,344,345,347],{"key":20,"text":69,"correct":26},{"key":24,"text":65,"correct":22},{"key":28,"text":346,"correct":22},"回头曲线",{"key":31,"text":63,"correct":22},{"id":349,"libraryId":5,"type":15,"typeLabel":16,"stem":350,"options":351,"answer":28,"analysis":33},913669,"竣工总图的编绘，应收集众多资料。下列选项中，不属于竣工总图编绘应收集资料范畴的是()。",[352,354,356,358],{"key":20,"text":353,"correct":22},"施工设计图",{"key":24,"text":355,"correct":22},"施工检测记录",{"key":28,"text":357,"correct":26},"建筑物立面图",{"key":31,"text":359,"correct":22},"竣工测量资料",{"id":361,"libraryId":5,"type":15,"typeLabel":16,"stem":362,"options":363,"answer":31,"analysis":33},913670,"关于地形图基本等高距、比例尺和地形类别三者关系的描述，以下说法正确的是()。",[364,366,368,370],{"key":20,"text":365,"correct":22},"测图比例尺越大，基本等高距越小；地形越复杂，基本等高距越小",{"key":24,"text":367,"correct":22},"测图比例尺越大，基本等高距越大；地形越复杂，基本等高距越小",{"key":28,"text":369,"correct":22},"测图比例尺越大，基本等高距越大；地形越复杂，基本等高距越大",{"key":31,"text":371,"correct":26},"测图比例尺越大，基本等高距越小；地形越复杂，基本等高距越大",{"id":373,"libraryId":5,"type":15,"typeLabel":16,"stem":374,"options":375,"answer":28,"analysis":33},913671,"下列关于工程控制网的特点说法不正确的是()。",[376,378,380,382],{"key":20,"text":377,"correct":22},"控制网的大小、形状应和工程相适应",{"key":24,"text":379,"correct":22},"可采用独立的坐标系",{"key":28,"text":381,"correct":26},"地面控制网精度一定要均匀",{"key":31,"text":383,"correct":22},"投影面的选择应满足控制点坐标反算两点间长度与实地两点间长度之差尽可能小的要求",{"id":385,"libraryId":5,"type":15,"typeLabel":16,"stem":386,"options":387,"answer":28,"analysis":33},913672,"根据《工程测量规范》(GB50026—2007)，数字高程模型建立后应进行检查，并符合下列规定：对用实测数据建立的数字高程模型，应进行外业实测检查并统计精度；每个图幅的检测点数不应少于()个点，且均匀分布。",[388,390,392,394],{"key":20,"text":389,"correct":22},"10",{"key":24,"text":391,"correct":22},"15",{"key":28,"text":393,"correct":26},"20",{"key":31,"text":395,"correct":22},"30",{"id":397,"libraryId":5,"type":15,"typeLabel":16,"stem":398,"options":399,"answer":28,"analysis":33},913673,"采用偏角法测设圆曲线时，其偏角应等于相应弧长所对圆心角的()。",[400,402,404,405],{"key":20,"text":401,"correct":22},"3倍",{"key":24,"text":403,"correct":22},"2倍",{"key":28,"text":310,"correct":26},{"key":31,"text":312,"correct":22},{"id":407,"libraryId":5,"type":15,"typeLabel":16,"stem":408,"options":409,"answer":24,"analysis":33},913674,"根据《工程测量规范》(GB50026—2007)，对于GPS-RTK测图，参考站点位的选择应符合下列规定：参考站的有效作业半径不应超过()。",[410,412,414,416],{"key":20,"text":411,"correct":22},"5km",{"key":24,"text":413,"correct":26},"10km",{"key":28,"text":415,"correct":22},"15km",{"key":31,"text":417,"correct":22},"20km",{"id":419,"libraryId":5,"type":15,"typeLabel":16,"stem":420,"options":421,"answer":28,"analysis":33},913675,"对于两开挖洞口间长度小于4km的隧道工程，其相向施工中线在贯通面上的高程贯通误差，不应大于()。",[422,424,426,428],{"key":20,"text":423,"correct":22},"30mm",{"key":24,"text":425,"correct":22},"50mm",{"key":28,"text":427,"correct":26},"70mm",{"key":31,"text":429,"correct":22},"100mm",{"id":431,"libraryId":5,"type":15,"typeLabel":16,"stem":432,"options":433,"answer":31,"analysis":33},913676,"关于隧道控制测量，以下说法错误的是()。",[434,436,438,440],{"key":20,"text":435,"correct":22},"洞外高程控制测量通常使用水准测量",{"key":24,"text":437,"correct":22},"每个洞口应埋设不少于两个水准点，最好是一站可以观测这两点的高差",{"key":28,"text":439,"correct":22},"洞外平面控制测量可以使用GPS定位",{"key":31,"text":441,"correct":26},"洞内平面控制测量可以使用GPS定位",{"id":443,"libraryId":5,"type":15,"typeLabel":16,"stem":444,"options":445,"answer":24,"analysis":33},913677,"工程控制网的建立步骤不包括()。",[446,448,450,452],{"key":20,"text":447,"correct":22},"设计",{"key":24,"text":449,"correct":26},"绘制地形图",{"key":28,"text":451,"correct":22},"选点埋石",{"key":31,"text":453,"correct":22},"观测和平差计算",{"id":455,"libraryId":5,"type":15,"typeLabel":16,"stem":456,"options":457,"answer":28,"analysis":33},913678,"根据《工程测量规范》（GB50026—2007），对于GPS-RTK测图，流动站的作业应符合下列规定：流动站作业的有效卫星数不宜少于()个，PDOP值应小于6，并应采用固定解成果。",[458,459,460,461],{"key":20,"text":219,"correct":22},{"key":24,"text":221,"correct":22},{"key":28,"text":191,"correct":26},{"key":31,"text":193,"correct":22},{"id":463,"libraryId":5,"type":15,"typeLabel":16,"stem":464,"options":465,"answer":24,"analysis":33},913679,"在建筑物的沉降观测中，每个工程至少应有()个基准点。",[466,467,468,469],{"key":20,"text":221,"correct":22},{"key":24,"text":219,"correct":26},{"key":28,"text":217,"correct":22},{"key":31,"text":215,"correct":22},{"id":471,"libraryId":5,"type":15,"typeLabel":16,"stem":472,"options":473,"answer":20,"analysis":33},913680,"下列坐标系中肯定不属于独立坐标系的是()。",[474,476,478,480],{"key":20,"text":475,"correct":26},"北京坐标系",{"key":24,"text":477,"correct":22},"施工坐标系",{"key":28,"text":479,"correct":22},"工程坐标系",{"key":31,"text":481,"correct":22},"地方坐标系",{"id":483,"libraryId":5,"type":15,"typeLabel":16,"stem":484,"options":485,"answer":24,"analysis":33},913681,"控制网优化设计是指在一定的人力、物力、财力等条件下，设计出精度高、可靠性强、经费最省的控制网布设方案。控制网优化设计分为四类，其中“一类设计”是指()。",[486,488,490,492],{"key":20,"text":487,"correct":22},"基准设计",{"key":24,"text":489,"correct":26},"网形设计",{"key":28,"text":491,"correct":22},"权设计",{"key":31,"text":493,"correct":22},"改进设计或加密设计",{"id":495,"libraryId":5,"type":15,"typeLabel":16,"stem":496,"options":497,"answer":24,"analysis":33},913682,"对于精密工程控制网布设，以下描述不正确的是()。",[498,500,502,504],{"key":20,"text":499,"correct":22},"控制网的精度指标是根据精密工程关键部位竣工位置的容许误差确定",{"key":24,"text":501,"correct":26},"精密工程控制网必须要分两次布网",{"key":28,"text":503,"correct":22},"精密工程控制网必须进行优化设计",{"key":31,"text":505,"correct":22},"精密高程控制网主要采用水准测量的方法建立",{"id":507,"libraryId":5,"type":15,"typeLabel":16,"stem":508,"options":509,"answer":31,"analysis":33},913683,"按《工程测量规范》(GB50026—2007)，地形图的基本等高距应按地形类别和测图比例尺进行选择，对于地形倾角小于3°的地区，绘制1:1000的地形图等高距应为()。",[510,511,512,513],{"key":20,"text":287,"correct":22},{"key":24,"text":301,"correct":22},{"key":28,"text":303,"correct":22},{"key":31,"text":299,"correct":26},{"id":515,"libraryId":5,"type":15,"typeLabel":16,"stem":516,"options":517,"answer":24,"analysis":33},913684,"下列选项不属于变形测量特点的是()。",[518,520,522,524],{"key":20,"text":519,"correct":22},"重复观测",{"key":24,"text":521,"correct":26},"难度大",{"key":28,"text":523,"correct":22},"精度高",{"key":31,"text":525,"correct":22},"变形测量的数据处理要求更加严密",{"id":527,"libraryId":5,"type":15,"typeLabel":16,"stem":528,"options":529,"answer":24,"analysis":33},913685,"下列不属于工程控制网布网原则的是()。",[530,532,534,536],{"key":20,"text":531,"correct":22},"分级布网，逐级控制",{"key":24,"text":533,"correct":26},"控制网精度高，控制范围小",{"key":28,"text":535,"correct":22},"要有足够的精度和可靠性",{"key":31,"text":537,"correct":22},"要有足够的密度",{"id":539,"libraryId":5,"type":15,"typeLabel":16,"stem":540,"options":541,"answer":31,"analysis":33},913686,"以下不属于地下管线探测方法的是()。",[542,544,546,548],{"key":20,"text":543,"correct":22},"实地调查法",{"key":24,"text":545,"correct":22},"物探调查法",{"key":28,"text":547,"correct":22},"开挖调查法",{"key":31,"text":549,"correct":26},"目估调查法",{"id":551,"libraryId":5,"type":15,"typeLabel":16,"stem":552,"options":553,"answer":24,"analysis":33},913687,"对数字测图方法，对于1：500测图，每平方千米图根点的数量不少于()个。",[554,556,557,559],{"key":20,"text":555,"correct":22},"50",{"key":24,"text":334,"correct":26},{"key":28,"text":558,"correct":22},"100",{"key":31,"text":560,"correct":22},"150",{"id":562,"libraryId":5,"type":15,"typeLabel":16,"stem":563,"options":564,"answer":31,"analysis":33},913688,"地下管线探查应在充分收集和分析已有资料的基础上，采用()的方法进行。",[565,567,569,571],{"key":20,"text":566,"correct":22},"开挖查看",{"key":24,"text":568,"correct":22},"实地调查",{"key":28,"text":570,"correct":22},"仪器探查",{"key":31,"text":572,"correct":26},"实地调查与仪器探查相结合",{"id":574,"libraryId":5,"type":15,"typeLabel":16,"stem":575,"options":576,"answer":20,"analysis":33},913689,"线路竣工测量不包括()。",[577,579,581,583],{"key":20,"text":578,"correct":26},"放样测量",{"key":24,"text":580,"correct":22},"中线测量",{"key":28,"text":582,"correct":22},"高程测量",{"key":31,"text":584,"correct":22},"横断面测量",{"id":586,"libraryId":5,"type":15,"typeLabel":16,"stem":587,"options":588,"answer":20,"analysis":33},913690,"施工控制网一般选择投影到主施工高程面作为投影面而不进行高斯投影，主要是为了()。",[589,591,593,595],{"key":20,"text":590,"correct":26},"方便施工放样，方便控制网观测",{"key":24,"text":592,"correct":22},"方便平差计算",{"key":28,"text":594,"correct":22},"方便观测记录",{"key":31,"text":596,"correct":22},"与城市控制网相区别",[598,601,604,607,610,613],{"id":15,"name":599,"category":7,"favorite":600},"领导干部任职前廉政法规知识测试题",92,{"id":602,"name":603,"category":7,"favorite":15},595,"建筑结构与设备",{"id":605,"name":606,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":608,"name":609,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":611,"name":612,"category":7,"favorite":8},534,"BIM工程师",{"id":614,"name":612,"category":7,"favorite":8},535]