[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-916018":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},916018,589,2,"多选题","隧道工程铡量中，竖井联系测量的平面控制方法有( )。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","GPS-RTK测量法",false,{"key":16,"text":17,"correct":18},"B","陀螺经纬仪定向法",true,{"key":20,"text":21,"correct":18},"C","激光准直投点法",{"key":23,"text":24,"correct":14},"D","悬挂钢尺法",{"key":26,"text":27,"correct":18},"E","联系三角形法","BCE","隧道竖井联系测量方法。GB 50026-2007《工程测量规范》8.6.10条规定，竖井联系测量的平面控制，宜采用光学投点法、激光准直投点法、陀螺经纬仪定向法或联系三角形法。",{"id":6,"name":31,"category":32,"favorite":33},"测绘综合能力","建筑工程",0]