[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-915850":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},915850,589,2,"多选题","下列关于一、二等重力点联测说法不恰当的是()。",[11,15,18,22,25],{"key":12,"text":13,"correct":14},"A","每条测线一般在24h内闭合",true,{"key":16,"text":17,"correct":14},"B","重力测量过程中，仪器停放超过2h，可以继续观测",{"key":19,"text":20,"correct":21},"C","一等重力点联测路线应组成闭合环或附合在两基本点间",false,{"key":23,"text":24,"correct":21},"D","二等重力点联测起算点为重力基本点、一等重力点或其引点",{"key":26,"text":27,"correct":21},"E","加密重力测量的重力测线应形成闭合或附合路线","AB","国家基本重力点（含引点）、一等重力点联测联测每条测线一般在24h内闭合，特殊情况可放宽到48h；二等重力点联测一般在36h内闭合，困难地区可以放宽到48h。重力测量过程中，仪器停放超过2h，应在停放点作重复观测，以消除静态零漂。故选AB。",{"id":6,"name":31,"category":32,"favorite":33},"测绘综合能力","建筑工程",0]