[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-915808":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},915808,589,2,"多选题","时间系统规定了时间测量的参考标准，包括()。",[11,15,18,22,25],{"key":12,"text":13,"correct":14},"A","时刻的参考标准",true,{"key":16,"text":17,"correct":14},"B","时间间隔的尺度标准",{"key":19,"text":20,"correct":21},"C","采用的时间频率基准",false,{"key":23,"text":24,"correct":21},"D","守时系统",{"key":26,"text":27,"correct":21},"E","授时系统","AB","时间系统规定了时间测量的参考标准，包括时刻的参考标准和时间间隔的尺度标准。描述一个时间系统框架通常需要涉及采用的时间频率基准、守时系统、授时系统和覆盖范周等四个方面。选项C、D、E是时间系统具体实现方法的内容。",{"id":6,"name":31,"category":32,"favorite":33},"测绘综合能力","建筑工程",0]