[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-915788":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},915788,589,2,"多选题","下列属于GNSS外业成果验收内容的有()。",[11,15,18,21,24],{"key":12,"text":13,"correct":14},"A","实施方案",true,{"key":16,"text":17,"correct":14},"B","补测、重测成果",{"key":19,"text":20,"correct":14},"C","数据处理报告",{"key":22,"text":23,"correct":14},"D","起算数据",{"key":25,"text":26,"correct":27},"E","经费使用是否符合预算",false,"ABCD","GNSS外业成果验收的重点为：①实施方案是否符合规范和技术设计的要求；②补测、重测和数据剔除是否合理；③数据处理软件是否符合要求，处理项目是否齐全，起算数据是否正确；④各项技术指标是否符合要求。故选ABCD。",{"id":6,"name":31,"category":32,"favorite":33},"测绘综合能力","建筑工程",0]