[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-915696":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},915696,589,2,"多选题","GIS项目管理的基本目标包括()。",[11,15,18,21,25],{"key":12,"text":13,"correct":14},"A","控制项目投资成本",true,{"key":16,"text":17,"correct":14},"B","保证系统开发质量",{"key":19,"text":20,"correct":14},"C","实现项目进度目标",{"key":22,"text":23,"correct":24},"D","压缩项目成本",false,{"key":26,"text":27,"correct":24},"E","加快项目进展速度","ABC","GIS项目管理的基本目标包括：控制项目投资成本、保证系统开发质量、实现项目进度目标。故选ABC。",{"id":6,"name":31,"category":32,"favorite":33},"测绘综合能力","建筑工程",0]