[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-915637":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},915637,589,2,"多选题","界桩位置应选在对反映边界线走向具有重要意义的边界点上，一般在()处埋设。",[11,15,18,22,25],{"key":12,"text":13,"correct":14},"A","边界线转折处",true,{"key":16,"text":17,"correct":14},"B","界线与河流相交处",{"key":19,"text":20,"correct":21},"C","有天然或人工标志的地段",false,{"key":23,"text":24,"correct":14},"D","以线状地物为界的边界线起讫处",{"key":26,"text":27,"correct":21},"E","界线走向实地明显，且无道路通过的地段","ABD","界桩位置应选在对反映边界线走向具有重要意义的边界点上或边界点附近，一般为实地地形不易辨别的边界线转折处、界线与河流相交处、过境道路与边界线相交处、以线状地物为界的边界线起讫处等。",{"id":6,"name":31,"category":32,"favorite":33},"测绘综合能力","建筑工程",0]