[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-915560":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},915560,589,2,"多选题","隧道施工测量中，常采用导线法进行洞内控制测量，与洞外导线相比，洞内导线具有的特点是()。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","导线形状只能敷设支导线或狭长形导线环",true,{"key":16,"text":17,"correct":18},"B","对导线边长没有限制，可以任意布设",false,{"key":20,"text":21,"correct":14},"C","导线不能一次布设完成，随着隧道的开挖逐渐向前延伸",{"key":23,"text":24,"correct":14},"D","导线点有时设于坑道顶板，采用点下对中",{"key":26,"text":27,"correct":14},"E","导线只能用重复观测的方法进行检核","ACDE","与洞外导线相比，洞内导线具有以下特点：①导线形状完全取决于隧道的形状，只能敷设支导线或狭长形导线环；②导线不能一次布设完成，随着隧道的开挖逐渐向前延伸；③导线只能用重复观测的方法进行检核；④导线点有时设于坑道顶板，采用点下对中。",{"id":6,"name":31,"category":32,"favorite":33},"测绘综合能力","建筑工程",0]