[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-915555":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},915555,589,2,"多选题","地下工程施工阶段主要的工作内容有()。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","测绘竣工图",false,{"key":16,"text":17,"correct":18},"B","放样出施工中线",true,{"key":20,"text":21,"correct":14},"C","设备安装测量",{"key":23,"text":24,"correct":18},"D","地面控制和地下控制",{"key":26,"text":27,"correct":18},"E","放样出施工腰线","BDE","地下工程施工控制测量分为：地面控制、地下控制。地下工程的定线放样工作包括：放样出施工中线、放样出施工腰线。A、C选项（测绘竣工图、设备安装测量）是地下工程竣工之后的工作，不属于地下工程施工阶段的测量工作。故选BDE。",{"id":6,"name":31,"category":32,"favorite":33},"测绘综合能力","建筑工程",0]