[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-915526":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},915526,589,2,"多选题","市政平面控制测量方法常用()。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","导线测量",true,{"key":16,"text":17,"correct":18},"B","水准测量",false,{"key":20,"text":21,"correct":14},"C","GPS测量",{"key":23,"text":24,"correct":18},"D","距离交会",{"key":26,"text":27,"correct":18},"E","三角高程测量","AC","市政工程测量的平面控制测量的主要方法为：GPS定位、导线测量。故选AC。",{"id":6,"name":31,"category":32,"favorite":33},"测绘综合能力","建筑工程",0]