[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-915521":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},915521,589,2,"多选题","地下工程测量过程中，高程测量可以采用()方法。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","水准测量",true,{"key":16,"text":17,"correct":18},"B","激光三维扫描",false,{"key":20,"text":21,"correct":18},"C","GPS水准",{"key":23,"text":24,"correct":14},"D","光电测距三角高程测量",{"key":26,"text":27,"correct":18},"E","导线测量","AD","请注意是地下工程，请注意是高程测量。首先可以排除选项B、E（激光三维扫描、导线测量），它们都不是高程测量方法。其次可以排除选项C(GPS水准)，因为地下工程，接收不到GPS信号。故选AD。",{"id":6,"name":31,"category":32,"favorite":33},"测绘综合能力","建筑工程",0]