[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-915515":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},915515,589,2,"多选题","工程测量的工作内容包括()。",[11,15,18,21,25],{"key":12,"text":13,"correct":14},"A","工程控制网的建立",true,{"key":16,"text":17,"correct":14},"B","工程地形图测绘",{"key":19,"text":20,"correct":14},"C","施工放样",{"key":22,"text":23,"correct":24},"D","大地水准面的精化",false,{"key":26,"text":27,"correct":14},"E","工程变形监测","ABCE","工程测量的工作内容包括控制网建立、地形图测绘、施工放样、质量检测和变形监测等。其中，大地水准面的精化属于大地测量的研究内容和工作，故不选D。",{"id":6,"name":31,"category":32,"favorite":33},"测绘综合能力","建筑工程",0]