[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-915486":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},915486,589,2,"多选题","当利用三个验潮站（或定点站）对其控制区域进行水位改正时，水位改正可分为()。",[11,15,18,22,25],{"key":12,"text":13,"correct":14},"A","单站水位改正",false,{"key":16,"text":17,"correct":14},"B","双站水位改正",{"key":19,"text":20,"correct":21},"C","分带内插法水位改正",true,{"key":23,"text":24,"correct":21},"D","时差法水位改正",{"key":26,"text":27,"correct":21},"E","解析模拟法水位改正","CDE","A、B不符合题意，现行《海道测量规范》(GB12327—1999)规定，当利用三个验潮站（或定点站）对其控制区域进行水位改正时，可使用时差法、分带内插法或解析模拟法。故选CDE。",{"id":6,"name":31,"category":32,"favorite":33},"测绘综合能力","建筑工程",0]