[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-915482":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},915482,589,2,"多选题","在海道测量技术设计之前，应收集的测区资料包括()。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","最大比例尺的地形图和海图",false,{"key":16,"text":17,"correct":18},"B","控制测量成果资料及其说明",true,{"key":20,"text":21,"correct":18},"C","水位控制资料",{"key":23,"text":24,"correct":18},"D","助航标志及航行障碍物的情况",{"key":26,"text":27,"correct":18},"E","其他与测量有关的资料","BCDE","A不符合规范要求，现行《海道测量规范》(GB12327—1999)规定在海道测量技术设计之前，应收集测区最新的地形图和海图，B、C、D、E项符合题意。故选BCDE。",{"id":6,"name":31,"category":32,"favorite":33},"测绘综合能力","建筑工程",0]