[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-915438":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},915438,589,2,"多选题","（2013 年） 航外控制测量方案设计时， 应收集的资料包括（） 。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","重力资料",false,{"key":16,"text":17,"correct":18},"B","地图资料",true,{"key":20,"text":21,"correct":18},"C","航摄资料",{"key":23,"text":24,"correct":14},"D","气象资料",{"key":26,"text":27,"correct":18},"E","水准资料","BCE","1 中的内容。 控制点方案设计之前应收集的资料包括： ①大地测量资料（测区及周边的等级控制点、 三角点、 水准点成果及点之记等） ； ②航摄资料（影像数据、 航摄略图等） ； ③地图资料（测区及周边的地形图、 交通图等） 。",{"id":6,"name":31,"category":32,"favorite":33},"测绘综合能力","建筑工程",0]