[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-915292":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},915292,589,1,"单选题","GIS软件测试四个基本步骤的先后顺序是（ ）。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","系统测试、确认测试、联合测试、模块测试",false,{"key":16,"text":17,"correct":14},"B","模块测试、确认测试、联合测试、系统测试",{"key":19,"text":20,"correct":14},"C","系统测试、联合测试、确认测试、模块测试",{"key":22,"text":23,"correct":24},"D","模块测试、联合测试、确认测试、系统测试",true,"GIS软件测试四个基本步骤的先后顺序是：模块测试、集成测试（联合测试）、确认测试、系统测试：①单元测试的对象是软件设计的最小单位，即模块。单元测试的依据是详细设计描述，单元测试应对模块内所有重要的控制路径设计测试用例，以便发现模块内部的错误；②集成测试又称组装测试、联合测试，是单元测试的逻辑扩展；③确认测试又称有效性测试，有效性测试是在模拟的环境下，运用黑盒测试的方法，验证被测软件是否满足需求规格说明书列出的需求；④系统测试是将已经确认的软件、硬件、网络等其他元素结合在一起，进行信息系统的各种组装测试和确认测试。",{"id":6,"name":27,"category":28,"favorite":29},"测绘综合能力","建筑工程",0]