[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-915224":3},{"question":4,"library":24},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":17,"analysis":23},915224,589,1,"单选题","下列地理信息系统测试中，不应由开发方进行的是（）。 A.单元测试 B.集成测试 C.验收测试 D.确认测试",[11,14,16,19,21],{"key":12,"text":12,"correct":13},"A",false,{"key":15,"text":15,"correct":13},"B",{"key":17,"text":17,"correct":18},"C",true,{"key":20,"text":20,"correct":13},"D",{"key":22,"text":22,"correct":13},"E","软件测试的过程和方法。单元测试、集成测试（也称组装测试，联合测试）应由开发方进行或开发方参与进行。确认测试又称有效性测试，是在模拟的环境下，运用黑盒测试的方法，验证被测软件是否满足需求规格说明书列出的需求，黑盒测试也称功能测试或数据驱动测试，是在已知产品所应具有的功能，通过测试来检测每个功能是否都能正常使用，这是 从用户观点出发的测试，所以不应由开发方进行。地理信息系统测试方法中无验收测试。",{"id":6,"name":25,"category":26,"favorite":27},"测绘综合能力","建筑工程",0]