[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-914912":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},914912,589,1,"单选题","某基于1∶10000比例尺地形图的行政区域界限测绘项目，采用光电测距附和导线测量方法测定界桩点的平面坐标。该导线全长15km，共15条边，根据现行《行政区域界线测绘规范》，其方位角闭合差不应超过（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","±60″",false,{"key":16,"text":17,"correct":18},"B","±80″",true,{"key":20,"text":21,"correct":14},"C","±100″",{"key":23,"text":24,"correct":14},"D","±120″","根据《行政区域界线测绘规范》（GB\u002FT 17796—2009）第6.2.3条规定，光电测距附合导线测量的主要技术指标与技术要求不应超过表的规定。",{"id":6,"name":27,"category":28,"favorite":29},"测绘综合能力","建筑工程",0]