[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-914829":3},{"question":4,"library":24},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":17,"analysis":23},914829,589,1,"单选题","地籍测量过程中，为某地区控制点设置保护点，保护点最少应设置（ ）个。 A.9 B.6 C.3 D.1",[11,14,16,19,21],{"key":12,"text":12,"correct":13},"A",false,{"key":15,"text":15,"correct":13},"B",{"key":17,"text":17,"correct":18},"C",true,{"key":20,"text":20,"correct":13},"D",{"key":22,"text":22,"correct":13},"E","根据地籍测绘规范规定，控制点设置保护点最少应设置3个。",{"id":6,"name":25,"category":26,"favorite":27},"测绘综合能力","建筑工程",0]