[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-914724":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},914724,589,1,"单选题","现行《工程测量规范》规定，线路定测放线测量前，应对初测高程控制点进行检测，检测点的比例应达到（ ）。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","5%",false,{"key":16,"text":17,"correct":14},"B","10%",{"key":19,"text":20,"correct":14},"C","50%",{"key":22,"text":23,"correct":24},"D","100%",true,"根据《工程测量规范（附条文说明）》（GB 50026—2007）第6.2.4条第1款规定，作业前，应收集初测导线或航测外控点的测量成果，并应对初测高程控制点逐一检测，即检测点的比例应达到100%。高程检测较差不应超过 mm（L为检测线路长度，单位为km）。",{"id":6,"name":27,"category":28,"favorite":29},"测绘综合能力","建筑工程",0]