[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-914713":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},914713,589,1,"单选题","某平坦地区1∶2000比例尺地形图的基本等高距确定为1m，全站仪测图时，除应选择一个图根点作为测站定向点外，尚应施测另一个图根点作为测站检核，检核点的高程较差不应大于（ ）m。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","±0.10",false,{"key":16,"text":17,"correct":14},"B","±0.15",{"key":19,"text":20,"correct":21},"C","±0.20",true,{"key":23,"text":24,"correct":14},"D","±0.25","根据《工程测量规范》（GB 50026—2007）第5.3.4条第2款规定，全站仪测图的仪器安置及测站检核，应符合下列要求：应选择较远的图根点作为测站定向点，并施测另一图根点的坐标和高程，作为测站检核。检核点的平面位置较差不应大于图上0.2mm，高程较差不应大于基本等高距的1\u002F5。因此检核点的高程较差不应大于：±1×1\u002F5＝±0.2（m）。",{"id":6,"name":27,"category":28,"favorite":29},"测绘综合能力","建筑工程",0]