[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-914500":3},{"question":4,"library":24},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":23},914500,589,1,"单选题","加密重力测量测线中，当仪器静放3小时以上时，必须在（ ）读数，按静态零漂计算。 A．静放前 B．静放后 C．静放中 D．静放前后",[11,14,16,18,21],{"key":12,"text":12,"correct":13},"A",false,{"key":15,"text":15,"correct":13},"B",{"key":17,"text":17,"correct":13},"C",{"key":19,"text":19,"correct":20},"D",true,{"key":22,"text":22,"correct":13},"E","加密重力测量。GB\u002FT 17944-2000《加密重力测量规范》5.3.7条规定，加密重力测量测线中仪器静放3小时以上时，必须在静放前后读数，按静态零漂计算。",{"id":6,"name":25,"category":26,"favorite":27},"测绘综合能力","建筑工程",0]