[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-914481":3},{"question":4,"library":24},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":23},914481,589,1,"单选题","《国家一、二等水准测量规范》规定，使用数字水准仪前，应进行预热，预热至少为（ ）次单次测量。 A．5 B．10 C．15 D．20",[11,14,16,18,21],{"key":12,"text":12,"correct":13},"A",false,{"key":15,"text":15,"correct":13},"B",{"key":17,"text":17,"correct":13},"C",{"key":19,"text":19,"correct":20},"D",true,{"key":22,"text":22,"correct":13},"E","数字水准仪观测外业测量技术要求。GB\u002FT 12897-2006《国家一、二等水准测量规范》7.7.1条规定，使用数字水准仪前，应进行预热，预热次数不少于20次。",{"id":6,"name":25,"category":26,"favorite":27},"测绘综合能力","建筑工程",0]