[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-914373":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},914373,589,1,"单选题","地图设计文件包括项目设计书、专业技术设计书。下列不属于地图设计文件内容的是()。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","制图区域概况和编图资料情况",false,{"key":16,"text":17,"correct":14},"B","引用文件",{"key":19,"text":20,"correct":14},"C","编制经费预算表",{"key":22,"text":23,"correct":24},"D","地图出版销售数量",true,"地图设计文件的内容，主要包括：任务概述、制图区域概况和编图资料情况、引用文件、成果（或产品）主要技术指标、设计方案、编制技术路线、质量控制、印刷与装帧、提交成果、制作进度计划、编制经费预算表、附录。地图设计文件的内容包括选项A、B、C，不包括选项D。故选D。",{"id":6,"name":27,"category":28,"favorite":29},"测绘综合能力","建筑工程",0]