[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-914303":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},914303,589,1,"单选题","印前处理不包括()。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","数据格式的转换",false,{"key":16,"text":17,"correct":14},"B","拼版、组版",{"key":19,"text":20,"correct":21},"C","打样",true,{"key":23,"text":24,"correct":14},"D","光栅化处理(RIP)","印前处理主要包括：数据格式的转换、符号压印的透明化处理、拼版、组版、分色加网及出血线、成品线、套合线和印刷装订的控制要素的添加、光栅化处理(RIP)、喷绘样等工作。选项A、B、D均为地图印前处理的内容，打样属于印刷过程。故选C。",{"id":6,"name":27,"category":28,"favorite":29},"测绘综合能力","建筑工程",0]