[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-914121":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},914121,589,1,"单选题","加密重力测量测线中，当仪器静放3h以上时，必须在()读数，按静态零漂计算。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","静放后",false,{"key":16,"text":17,"correct":14},"B","静放前",{"key":19,"text":20,"correct":21},"C","静放前后",true,{"key":23,"text":24,"correct":14},"D","静放中","根据《加密重力测量规范》(GB\u002FT17944—2000)，加密重力测量测线中，当仪器静放3h以上时，必须在静放前后读数，按静态零漂计算。故选C。",{"id":6,"name":27,"category":28,"favorite":29},"测绘综合能力","建筑工程",0]