[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-913992":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},913992,589,1,"单选题","GIS软件测试4个基本步骤的先后顺序是()。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","系统测试、确认测试、联合测试、模块测试",false,{"key":16,"text":17,"correct":14},"B","模块测试、确认测试、联合测试、系统测试",{"key":19,"text":20,"correct":14},"C","系统测试、联合测试、确认测试、模块测试",{"key":22,"text":23,"correct":24},"D","模块测试、联合测试、确认测试、系统测试",true,"@jin",{"id":6,"name":27,"category":28,"favorite":29},"测绘综合能力","建筑工程",0]