[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-913934":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},913934,589,1,"单选题","下面不属于系统可行性研究主要工作内容的有()。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","数据源调查与评估",false,{"key":16,"text":17,"correct":14},"B","技术可行性评估",{"key":19,"text":20,"correct":14},"C","系统的支持状况",{"key":22,"text":23,"correct":24},"D","数据模型流",true,"系统可行性研究主要工作内容包括：①数据源调查与评估；②技术可行性评估；③系统的支持状况；④经济和社会效益分析。",{"id":6,"name":27,"category":28,"favorite":29},"测绘综合能力","建筑工程",0]