[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-913775":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},913775,589,1,"单选题","下列选项不属于立交桥施工测量内容的是()。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","桥梁施工控制网建立",false,{"key":16,"text":17,"correct":14},"B","桥址地形图测绘",{"key":19,"text":20,"correct":14},"C","桥梁高程控制网建立",{"key":22,"text":23,"correct":24},"D","桥梁的变形监测",true,"立交桥测量内容包括：桥址地形图测绘、桥梁施工控制网建立、桥梁高程控制网建立、桥墩台基础施工放样、桥梁竣工测量等。选项D（桥梁的变形监测），属于桥梁运营期的测量工作，不属于施工期的测量工作。故选D。",{"id":6,"name":27,"category":28,"favorite":29},"测绘综合能力","建筑工程",0]