[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-913756":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},913756,589,1,"单选题","根据《工程测量规范》(GB50026—2007)，当水准路线需要跨越江河时，应符合下列规定：当跨越距离小于200m时，可采用单线过河；也可采用在测站上变换仪器高度的方法进行，两次观测高差较差不应超过()，取其平均值作为观测高差。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","3mm",false,{"key":16,"text":17,"correct":14},"B","5mm",{"key":19,"text":20,"correct":14},"C","6mm",{"key":22,"text":23,"correct":24},"D","7mm",true,"《工程测量规范》(GB50026—2007.第4.2.6条规定：当水准路线需要跨越江河（湖塘、宽沟、洼地、山谷等）时，当跨越距离小于200m时，可采用单线过河，也可采用在测站上变换仪器高度的方法进行；两次观测高差较差不应超过7mm，取其平均值作为观测高差。故选D。",{"id":6,"name":27,"category":28,"favorite":29},"测绘综合能力","建筑工程",0]