[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-913752":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},913752,589,1,"单选题","施工控制网有时分两级布网，次级网的精度()首级网的精度。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","一定低于",false,{"key":16,"text":17,"correct":14},"B","一定高于",{"key":19,"text":20,"correct":21},"C","可能高于",true,{"key":23,"text":24,"correct":14},"D","等于","本题考查控制网逐级控制的唯一特例。施工控制网有时次级网的精度会高于首级网的精度。故选C。",{"id":6,"name":27,"category":28,"favorite":29},"测绘综合能力","建筑工程",0]