[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-913723":3},{"question":4,"library":23},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":22},913723,589,1,"单选题","根据《工程测量规范》(GB50026—2007)，在GPS-RTK测图作业前，应先求取WGS84坐标系与测区地方坐标系的转换参数。转换参数的应用，应符合下列规定：使用前，应对转换参数的精度、可靠性进行分析和实测检查；检查点应分布在测区的中部和边缘；检测结果，平面较差不应大于5cm，高程较差不应大于()。(注：D为参考站到检查点的距离，单位为km)",[11,15,18,20],{"key":12,"text":13,"correct":14},"A","",false,{"key":16,"text":13,"correct":17},"B",true,{"key":19,"text":13,"correct":14},"C",{"key":21,"text":13,"correct":14},"D","根据《工程测量规范》(GB50026—2007)第5.3.12条，转换参数的应用，应符合下列规定：使用前，应对转换参数的精度、可靠性进行分析和实测检查；检查点应分布在测区的中部和边缘；检测结果，平面较差不应大于5cm，高程较差不应大于 (注：D为参考站到检查点的距离，单位为km)。故选B。",{"id":6,"name":24,"category":25,"favorite":26},"测绘综合能力","建筑工程",0]