[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-913689":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},913689,589,1,"单选题","线路竣工测量不包括()。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","放样测量",true,{"key":16,"text":17,"correct":18},"B","中线测量",false,{"key":20,"text":21,"correct":18},"C","高程测量",{"key":23,"text":24,"correct":18},"D","横断面测量","线路的竣工测量包括三个方面：中线测量、高程测量、横断面测量。选项A（放样测量），不属于线路竣工测量的内容。故选A。",{"id":6,"name":27,"category":28,"favorite":29},"测绘综合能力","建筑工程",0]